KOSMOS / RESIDENTIAL CONSTRUCTION
Full house renovations
Treat a complete renovation as a connected programme rather than a collection of unrelated trades. The order of work matters as much as the finished appearance.
Plan the work as a whole.
Establish what is being retained, repaired or replaced before finishes are selected. Survey findings, structural changes, electrical work, heating, moisture management and access can all affect the programme.
Care at every interface.
KOSMOS coordinates preparation, building services and finishing work under direct project management. A written scope helps distinguish required work, optional upgrades and decisions that need specialist design or certification.


Questions before you build.
Where should a whole-house renovation begin?
Start with your priorities, available surveys and drawings, and the condition of the building. Agree the investigation and design work before committing to detailed finishes.
Can the renovation be phased?
Yes, where practical. The sequence must account for shared services, access and work that would otherwise disturb completed rooms.